OPERATIONS CENTER
REAL-TIME FACILITY INTELLIGENCE · TUESDAY, APRIL 28, 2026
📋
Active Work Orders
23 open
↑ 4 from yesterday
⚡
Energy Today
4,821 kWh
↓ 3.2% vs baseline
⬡
System Uptime
99.8 %
↑ SLA target: 99.5%
🔴
Critical Alarms
3 active
⚠ Requires action
🗓
PM Items Due
3 this wk
1 overdue
🔔 Live Alarms
View All →
Compressor High Discharge Pressure — AHU-03 Zone 3B
P-501
FCU Address Mismatch Code 35 — Units 7–12 Offline
FCU-E35
UPS Battery Runtime Degraded — < 8 Min Threshold
UPS-A04
VRF Leaving Water Temp Out of Design Range
VRF-T12
Monthly Generator Exercise Test — PASSED
GEN-01
📊 System Status
HVAC Efficiency
91%
Power Load
74%
Chiller COP
4.2
BAS Uptime
99.8%
Fire Systems
100%
Security Zones
94%
⚡ Energy — This Week
Mon
Tue
Wed
Thu
Fri
Sat
Sun
29.5k kWh
Consumed
$4,280
Saved
12.4t
CO₂ Offset
📋 Work Orders
Open Triage →
WO-4821
Compressor Replacement — AHU-03 Zone 3B
CRITICAL
OVERDUE 2d
WO-4820
FCU Address Reset — Code 35 (Units 7–12)
OPEN
Due Today
WO-4819
Emergency Generator Load Bank Test
IN PROG
On Track
WO-4818
Roof Drain Water Infiltration Investigation
OPEN
Due in 36h
WO-4817
BAS Sensor Array Integration — Phase 2
IN PROG
On Track
🔧 PM Schedule
PM Planner →
OVERDUE 3d
Emergency Generator Monthly Exercise
R. Thompson
Due Friday
Cooling Tower Water Treatment & Check
J. Martinez
Due May 2
Electrical Panel IR Thermography — Twr A
T. Chen
Due May 15
Fire Suppression Quarterly Test
AFS Vendor
Due May 20
AHU Filter Replacement — All Units
J. Martinez
🏭 Engineering Rounds
Full Log →
MDF Room Temperature
Server Room C1 · Basement · Limit 75°F
81°F
IDF Room — Floor 6
Network Closet 6B · Normal range
68°F
UPS System A — Runtime
Battery at 84% · Runtime < 8 min threshold
7m 42s
Chiller #1 EWT/LWT
EWT 54°F / LWT 42°F — ΔT 12°F · Normal
OK
Leak Sensor — Mech Room
Under Cooling Tower 2 · No moisture detected
Dry
ATS Transfer Switch
Utility→Generator logic test — PASS
PASS